We were proud to deliver the plumbing installation for a large hotel in Hastings, working meticulously to the designer’s specifications. The project included the full installation of hot and cold water supplies, bathroom suites, and comprehensive drainage systems. Multiple plant rooms were installed, ensuring localised hot water in each area of the building. For ease of maintenance and to prevent guest tampering, we also installed localised isolation points in cupboards outside each room, giving staff full control over hot, cold, and return pipes without disrupting operations. Every element was completed to the highest standards, combining functionality with a seamless, professional finish.